Saves $/year in energy costs*
See how much you would save in energy
costs by allowing access to your location.
Attaches directly to junction box in rigid ceilings. 4’ max. spacing. Track sections must be supported within 6” of any connection point unless T92 or T92L Structural Bridges are used. Typically requires 2 per 2’ or 4’ track, 3 per 6’ or 8’ track, or 4 per 12’ track. More supports, spaced closer together, may be required when installing heavier or unbalanced luminaires. Includes canopy, J-Box mounting strap, stem and track attachment hardware. For electrical feed, order T93 wireway cover. Stems need to be rethreaded if cut in the field.