Saves $/year in energy costs*
See how much you would save in energy
costs by allowing access to your location.
Compatible with 15/16” flush T-Bar ceilings. 4’ max. spacing. Track sections must be supported within 6” of any connection point unless T92 or T92L Structural Bridges are used. Typically requires 2 per 2’ or 4’ track, 3 per 6’ or 8’ track, or 4 per 12’ track. More supports, spaced closer together, may be required when installing heavier or unbalanced luminaires. Includes canopy, T-Bar mounting plate, stem and track attachment hardware. For electrical feed, order T93 wireway cover. Stems need to be rethreaded if cut in the field.